Failure Times - Duane Example: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 49: | Line 49: | ||
<li> The following figure shows the cumulative and instantaneous MTBF curves. | <li> The following figure shows the cumulative and instantaneous MTBF curves. | ||
[[Image:rga4.12.png | [[Image:rga4.12.png|center|450px]]</li> | ||
<li>The next figure shows the cumulative test and development hours needed for an instantaneous MTBF goal of 500 hours. | <li>The next figure shows the cumulative test and development hours needed for an instantaneous MTBF goal of 500 hours. | ||
[[Image:rga4.13.png | [[Image:rga4.13.png|center|450px]]</li> | ||
<li>The figure below shows the cumulative test and development hours needed for a cumulative MTBF goal of 500 hours. | <li>The figure below shows the cumulative test and development hours needed for a cumulative MTBF goal of 500 hours. | ||
[[Image:rga4.14.png | [[Image:rga4.14.png|center|450px]]</li> | ||
</ol> | </ol> |
Revision as of 22:18, 2 June 2014
New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.
As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at RGA examples and RGA reference examples.
This example appears in the Reliability Growth and Repairable System Analysis Reference.
A prototype of a system was tested with design changes incorporated during the test. A total of 12 failures occurred. The data set is given in the following table.
Failure Number | Cumulative Test Time(hours) |
---|---|
1 | 80 |
2 | 175 |
3 | 265 |
4 | 400 |
5 | 590 |
6 | 1100 |
7 | 1650 |
8 | 2010 |
9 | 2400 |
10 | 3380 |
11 | 5100 |
12 | 6400 |
Do the following:
- Estimate the Duane parameters.
- Plot the cumulative and instantaneous MTBF curves.
- How many cumulative test and development hours are required to meet an instantaneous MTBF goal of 500 hours?
- How many cumulative test and development hours are required to meet a cumulative MTBF goal of 500 hours?
Solution
- The next figure shows the data entered into RGA along with the estimated Duane parameters.
- The following figure shows the cumulative and instantaneous MTBF curves.
- The next figure shows the cumulative test and development hours needed for an instantaneous MTBF goal of 500 hours.
- The figure below shows the cumulative test and development hours needed for a cumulative MTBF goal of 500 hours.