Failure Times - Duane Example

From ReliaWiki
Jump to navigation Jump to search
RGA Examples Banner.png


New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.

As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at RGA examples and RGA reference examples.




This example appears in the Reliability growth reference.


A prototype of a system was tested with design changes incorporated during the test. A total of 12 failures occurred. The data set is given in the following table.

Developmental Test Data
Failure Number Cumulative Test Time(hours)
1 80
2 175
3 265
4 400
5 590
6 1100
7 1650
8 2010
9 2400
10 3380
11 5100
12 6400

Do the following:

  1. Estimate the Duane parameters.
  2. Plot the cumulative and instantaneous MTBF curves.
  3. How many cumulative test and development hours are required to meet an instantaneous MTBF goal of 500 hours?
  4. How many cumulative test and development hours are required to meet a cumulative MTBF goal of 500 hours?

Solution

  1. The next figure shows the data entered into RGA along with the estimated Duane parameters.
    Rga4.11.png
  2. The following figure shows the cumulative and instantaneous MTBF curves.
    Rga4.12.png
  3. The next figure shows the cumulative test and development hours needed for an instantaneous MTBF goal of 500 hours.
    Rga4.13.png
  4. The figure below shows the cumulative test and development hours needed for a cumulative MTBF goal of 500 hours.
    Rga4.14.png