== Usage Example == | == Usage Example == | ||
In this example, a new URD is created and a failure model is assigned to it. The URD is then added to a project. | In this usage example, a new URD is created and a failure model is assigned to it. The URD is then added to a project. | ||
{{APIComment|'Connect to repository and open the first project.}} | {{APIComment|'Connect to repository and open the first project.}} | ||
Dim repo As New Repository | Dim repo As New Repository | ||
Line 25: | Line 25: | ||
urd.Name = "Example URD" | urd.Name = "Example URD" | ||
{{APIComment|'Assign | {{APIComment|'Assign the failure model with ID = 10 to the new URD.}} | ||
urd.FailureModelID = 10 | urd.FailureModelID = 10 | ||
Revision as of 22:45, 2 May 2014
Universal reliability definitions (URDs) are used to represent a set of properties that can include failure behavior and maintenance tasks. URDs are resources that are available for use throughout the project.
Constructors
- cURD Creates a new URD resource.
Properties
- Name (as string) Gets or sets the URD Name.
- ID (as integer) Gets the numerical ID of the URD.
- ProjectID (as integer) Gets the numerical ID of the project the URD belongs to.
- FailureModelID (as integer) Gets or sets the numerical ID of the the failure model assigned to the URD.
- CorrectiveTaskID (as integer) Gets or sets the numerical ID of the the corrective task assigned to the URD.
- ScheduledTaskIDs (as integer()) Gets or sets a list of the numerical IDs of the scheduled tasks assigned to the URD.
Usage Example
In this usage example, a new URD is created and a failure model is assigned to it. The URD is then added to a project.
'Connect to repository and open the first project. Dim repo As New Repository repo.ConnectToRepository("C:\Users\Name\Documents\ReliaSoft\Files\database.rsr9") repo.SetCurrentProject(1) 'Create a new URD and give it a name. Dim urd As New cURD urd.Name = "Example URD" 'Assign the failure model with ID = 10 to the new URD. urd.FailureModelID = 10 'Add the URD to the current project.' repo.AddURD urd 'Disconnect from the repository. repo.DisconnectFromRepository