CURD Class: Difference between revisions
Jump to navigation
Jump to search
Chris Kahn (talk | contribs) No edit summary |
Chris Kahn (talk | contribs) No edit summary |
||
Line 13: | Line 13: | ||
*CorrectiveTaskID (as ''integer'') {{APIComment|Gets or sets the numerical ID of the the corrective task assigned to the URD.}} | *CorrectiveTaskID (as ''integer'') {{APIComment|Gets or sets the numerical ID of the the corrective task assigned to the URD.}} | ||
*ScheduledTaskIDs (as ''integer()'') {{APIComment|Gets or sets a list of the numerical IDs of the scheduled tasks assigned to the URD.}} | *ScheduledTaskIDs (as ''integer()'') {{APIComment|Gets or sets a list of the numerical IDs of the scheduled tasks assigned to the URD.}} | ||
== Usage Example == | |||
In this example, a new URD is created and a failure model is assigned to it. The URD is then added to a project. | |||
{{APIComment|'Connect to repository and open the first project.}} | |||
Dim repo As New Repository | |||
repo.ConnectToRepository("C:\Users\Name\Documents\ReliaSoft\Files\database.rsr9") | |||
repo.SetCurrentProject(1) | |||
{{APIComment|'Create a new URD and give it a name.}} | |||
Dim urd As New cURD | |||
urd.Name = "Example URD" | |||
{{APIComment|'Assign an existing failure model to the new URD.}} | |||
urd.FailureModelID = 10 | |||
{{APIComment|'Add the URD to the current project.'}} | |||
repo.AddURD urd | |||
{{APIComment|'Disconnect from the repository.}} | |||
repo.DisconnectFromRepository |
Revision as of 22:44, 2 May 2014
Universal reliability definitions (URDs) are used to represent a set of properties that can include failure behavior and maintenance tasks. URDs are resources that are available for use throughout the project.
Constructors
- cURD Creates a new URD resource.
Properties
- Name (as string) Gets or sets the URD Name.
- ID (as integer) Gets the numerical ID of the URD.
- ProjectID (as integer) Gets the numerical ID of the project the URD belongs to.
- FailureModelID (as integer) Gets or sets the numerical ID of the the failure model assigned to the URD.
- CorrectiveTaskID (as integer) Gets or sets the numerical ID of the the corrective task assigned to the URD.
- ScheduledTaskIDs (as integer()) Gets or sets a list of the numerical IDs of the scheduled tasks assigned to the URD.
Usage Example
In this example, a new URD is created and a failure model is assigned to it. The URD is then added to a project.
'Connect to repository and open the first project. Dim repo As New Repository repo.ConnectToRepository("C:\Users\Name\Documents\ReliaSoft\Files\database.rsr9") repo.SetCurrentProject(1) 'Create a new URD and give it a name. Dim urd As New cURD urd.Name = "Example URD" 'Assign an existing failure model to the new URD. urd.FailureModelID = 10 'Add the URD to the current project.' repo.AddURD urd 'Disconnect from the repository. repo.DisconnectFromRepository