ALTADataSet.PlotUseStress

From ReliaWiki
Jump to navigation Jump to search


Sets or gets the use stress value of a particular stress for use in plots (not calculations), using the specified stress index.

To set the use stress level for calculations, use the SetUseStress method on ALTADataSet.FittedModel.

Syntax

  • PlotUseStress( Index As Integer )

Parameters

Index: The index of the stress column (e.g., 0 = the first stress, 1 = the second, etc.).

Value

Type: double

Usage Example

This example demonstrates how to add a stress and set its stress transformation.

 'Declare the ALTADataSet. See ALTADataSet. 
 Dim ALTADS as New ALTADataSet
 
 'Add a new stress. 
 ALTADS.AddStressDefinition("Stress1")
 
 'Set the use stress level (to be used in plots) for the first stress. 
 ALTADS.PlotUseStress(0) = 200