Repository.Task.GetAllScheduledTasks
Jump to navigation
Jump to search
Returns an array containing all scheduled tasks from the current project.
Syntax
- GetAllScheduledTasks()AscScheduledTask()
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Get the list of scheduled tasks in the connected repository from the current project.
Dim ListOfScheduledTasks() As cScheduledTask ListOfScheduledTasks = MyRepository.GetAllScheduledTasks()