ALTADataSet.AddFailureInterval
Jump to navigation
Jump to search
Adds a failure interval and associated stress level to the data set.
Method Syntax
- AddFailureInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress() As Object )
- AddFailureInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress1 As Object )
- AddFailureInterval( ByVal StartValue As Double , ByVal EndValue As Double , ByVal NumberInGroup As Integer , ByRef Stress1, Stress2 As Object )
Parameters
StartValue The starting value of this failure interval.
EndValue The ending value of this failure interval.
NumberInGroup The number of units that failed during this interval.
Stress() An array of numeric values or references to ALTAStressProfiles already entered into the ALTADataSet
Stress1 An numeric value or a reference to an ALTAStressProfile
Stress2 An numeric value or a reference to an ALTAStressProfile
Usage Example
Declare the ALTADataSet. See New ALTADataSet for additional details.
Dim ALTADS as New ALTADataSet
Declare an ALTAStressProfile. See ALTAStressProfile for additional details.
Dim sp = New ALTAStressProfile("Profile1") sp.RepeatCycle = True sp.AddSegment(1, 250) sp.AddSegment(2, 300) sp.AddSegment(3, 400)
Add values to the raw data.
ALTADS.AddFailureInterval(1, 5, 1, sp) ALTADS.AddFailureInterval(6, 10, 1, sp) ALTADS.AddFailureInterval(11, 15, 1, sp)