Template:Aircraft Phases with Forced Landing

From ReliaWiki
Jump to navigation Jump to search

Aircraft Phases with Forced Landing

Consider a flight journey for a four-engine aircraft. The configuration of the aircraft changes at different time. During taxing phase, the navigation system and only 1-out-of-4 engines and all three landing gears are need. During take-off phase, four engines, navigation system and three landing gears are need. During cursing phase, navigation system and 3-out-of-4 engines are required. During landing phase,navigation system, 2-out-of-4 engines and three landing gears are required.

Purposes

The purposes of this example is to illustrate how to create a nonlinear system with F/S links in phase simulation.

RBDs for Phase and settings

The RBDs for Phase 1 and Phase 2 are as followings:

RBD for Phase 1 and 2.png