cScheduledTask.SetPools Method
Jump to navigation
Jump to search
Member of: SynthesisAPI.cScheduledTask
Sets the Pool IDs and number of parts for all pools required for the task.
Remarks: Alternatively, .NET users can use the Pools()
property in the class to get or set the crew IDs.
Syntax
.SetCrewIDs(arr())
Parameters
arr()
- Required as PoolInfo. An array of the Pool IDs and the number of parts for all pools required for the task.
Example
This example assumes that the repository contains existing pools.
VBA ... 'Add code to create a new task or get an existing task. Dim aTask As cScheduledTask ... 'Create an array and define the pools to be assigned. For this example, 'assume that Pool ID#2 and ID#4 are to be assigned to the task with 3 and 5 parts, respectively. Dim myarray(1) As Long myarray(0).ID = 2 myarray(0).NumParts = 3 myarray(1).ID = 4 myarray(1).NumParts = 5 'Assign the pools to the task. Call aTask.SetPools(myarray)