Master BOM Detail Update and Delete.CheckBox
Jump to navigation
Jump to search
Update
The detail will be updated if the Value element’s value has changed and equals “yes” or “no”. If the value does not match “yes” or “no” the value will be set to “no”, by default.
Delete
The detail will be deleted if the Value element is empty or does not exist.