BlockSim Example: Phase with Failure or Success Paths
Jump to navigation
Jump to search
Phase with F/S links
Purposes
The purposes of this example is to illustrate how to apply F/S links in Phase simulation.
RBDs for Phase and settings
The RBDs for Phase 1 and Phase 2 are as followings:
In Phase 1, Block A follows Weibull distribution with Beta = 1.5 and Eta = 1000 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1200 hours. No maintenance.
In Phase 2, Block A follows Weibull distribution with Beta = 1.5 and Eta = 900 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1150 hours. No maintenance.
Example 1
The Phase diagram is as followings:
Maintenance phase has a CM with duration 80 hours and PM with duration 20 hours for both Block A and B.