BlockSim Example: Phase with Failure or Success Paths: Difference between revisions
Jump to navigation
Jump to search
Dingzhou Cao (talk | contribs) |
Dingzhou Cao (talk | contribs) |
||
Line 8: | Line 8: | ||
The RBDs for Phase 1 and Phase 2 are as followings: | The RBDs for Phase 1 and Phase 2 are as followings: | ||
[[Image:RBD_for_Phase_1_and_2.png|thumb|center|500px]] | [[Image:RBD_for_Phase_1_and_2.png|thumb|center|500px]] | ||
In Phase 1, Block A follows Weibull distribution with Beta = 1.5 and Eta = 1000 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1200 hours. No maintenance. | |||
In Phase 2, Block A follows Weibull distribution with Beta = 1.5 and Eta = 900 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1150 hours. No maintenance. |
Revision as of 18:56, 23 September 2011
Phase with F/S links
Purposes
The purposes of this example is to illustrate how to apply F/S links in Phase simulation.
RBDs for Phase and settings
The RBDs for Phase 1 and Phase 2 are as followings:
In Phase 1, Block A follows Weibull distribution with Beta = 1.5 and Eta = 1000 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1200 hours. No maintenance.
In Phase 2, Block A follows Weibull distribution with Beta = 1.5 and Eta = 900 hours. Block B follows Weibull distribution with Beta = 1.5 and Eta = 1150 hours. No maintenance.