Repository.Task.GetAllScheduledTasks: Difference between revisions
Jump to navigation
Jump to search
Kate Racaza (talk | contribs) No edit summary |
Kate Racaza (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
<onlyinclude>Gets a list of scheduled tasks associated with a project. Returns a '''[[CScheduledTask Class|cScheduledTask]]''' object array that contains all the scheduled tasks in that project.</onlyinclude> | <onlyinclude>Gets a list of scheduled tasks associated with a project (does not include global or reference tasks). Returns a '''[[CScheduledTask Class|cScheduledTask]]''' object array that contains all the scheduled tasks in that project.</onlyinclude> | ||
== Syntax == | == Syntax == |
Revision as of 18:25, 10 September 2015
Member of: SynthesisAPI10.Repository
Gets a list of scheduled tasks associated with a project (does not include global or reference tasks). Returns a cScheduledTask object array that contains all the scheduled tasks in that project.
Syntax
.Task.GetAllScheduledTasks()
Example
This example assumes that scheduled tasks exist in the first available project of a repository.
VBA|VB.NET 'Add code to connect to a Synthesis repository. Dim MyRepository As New Repository ... 'Get a list of all scheduled tasks in project #1. Dim ListofTasks() As cScheduledTask MyRepository.Project.SetCurrentProject (1) ListofTasks = MyRepository.Task.GetAllScheduledTasks() 'Output sample: Display the number of elements in the array. Dim NumberofElements As Integer NumberofElements = UBound(ListofTasks) - LBound(ListofTasks) + 1 MsgBox (NumberofElements)