1P-Exponential MLE Solution for Interval Data: Difference between revisions
Jump to navigation
Jump to search
Kate Racaza (talk | contribs) No edit summary |
Kate Racaza (talk | contribs) No edit summary |
||
Line 38: | Line 38: | ||
The ML estimate <math>\hat{\theta}\,\!</math> = 572.3, and the standard deviation is <math>se_{\hat\theta}\,\!</math> = 41.72. Therefore the variance is 1740.56. | The ML estimate <math>\hat{\theta}\,\!</math> = 572.3, and the standard deviation is <math>se_{\hat\theta}\,\!</math> = 41.72. Therefore the variance is 1740.56. | ||
The 95% 2-sided confidence interval for <math>{\theta}\,\!</math> are: | |||
* Based on the likelihood ratio, the confidence interval is [498, 662]. The calculation is based on | * Based on the likelihood ratio, the confidence interval is [498, 662]. The calculation is based on | ||
::<math>-2ln\left [ \frac{L(\theta)}{L(\hat{\theta})} \right ] = X^{2}_{(0.90,1)}\,\!</math> | ::<math>-2ln\left [ \frac{L(\theta)}{L(\hat{\theta})} \right ] = X^{2}_{(0.90,1)}\,\!</math> | ||
Line 53: | Line 54: | ||
::<math>\begin{alignat}{2} | ::<math>\begin{alignat}{2} | ||
[\theta_{L},\theta_{U}]&= \hat{\theta}exp(\pm 1.96\times \frac{se_{\hat{\theta}}}{\hat{\theta}})\\ | [\theta_{L},\theta_{U}]&= \hat{\theta}exp\left(\pm 1.96\times \frac{se_{\hat{\theta}}}{\hat{\theta}}\right)\\ | ||
&=\left [572.3\times exp \left(-1.96\times\ | &= \left[572.3\times exp \left(-1.96\times\frac{41.72}{572.3}\right),572.3\times exp \left(1.96\times\frac{41.72}{572.3}\right)\right]\\ | ||
&= [496,660]\\ | &= [496,660]\\ | ||
\end{alignat}</math> | \end{alignat}</math> | ||
Line 73: | Line 74: | ||
* Based on the likelihood ratio (Select LRB for the confidence bound), the confidence interval is: | * Based on the likelihood ratio (Select LRB for the confidence bound), the confidence interval is: | ||
[[Image: | [[Image:1PE_interval_data_qcp.png|center|550 px]] | ||
* Based on lognormal approximation (select FM for the bound method), the confidence bounds are: | * Based on lognormal approximation (select FM for the bound method), the confidence bounds are: | ||
[[Image:1PE_interval_data_qcp_FM.png|center|550 px]] | |||
[ | |||
Revision as of 21:10, 30 June 2015
New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.
As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at Weibull examples and Weibull reference examples.