Repository.Task.UpdateCorrectiveTask: Difference between revisions
Jump to navigation
Jump to search
Chris Kahn (talk | contribs) No edit summary |
John Leavitt (talk | contribs) (→Syntax) |
||
Line 4: | Line 4: | ||
== Syntax == | == Syntax == | ||
*UpdateCorrectiveTask( task {{APIPrefix|As}} [[cCorrectiveTask Class|cCorrectiveTask]] ){{APIPrefix|As Boolean}} {{APIComment|{{Template:Repository.UpdateCorrectiveTask.Cmt}}}} | *UpdateCorrectiveTask( task {{APIPrefix|As}} [[cCorrectiveTask Class|cCorrectiveTask]] ){{APIPrefix|As Boolean}} {{APIComment|{{Template:Repository.UpdateCorrectiveTask.Cmt}}}} | ||
* | *UpdateScheduledTask( task {{APIPrefix|As}} [[cScheduledTask Class|cScheduledTask]] ){{APIPrefix|As Boolean}} {{APIComment|{{Template:Repository.UpdateScheduledTask.Cmt}}}} | ||
Parameters | Parameters |
Revision as of 18:03, 21 March 2014
Updates the specified task in the repository. Returns True if successful, otherwise returns False.
Syntax
- UpdateCorrectiveTask( task As cCorrectiveTask )As Boolean Updates the corrective task in the repository.
- UpdateScheduledTask( task As cScheduledTask )As Boolean Updates the scheduled task in the repository.
Parameters
- task: The cCorrectiveTask or cScheduledTask to update.
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Get the list of corrective tasks in the connected repository from the current project.
Dim ListOfCorrectiveTasks() As cCorrectiveTask ListOfCorrectiveTasks = MyRepository.GetAllCorrectiveTasks()
After updating the task, update the repository
Dim SuccessUpdateCorrectiveTask As Boolean = False SuccessUpdateCorrectiveTask = MyRepository.UpdateCorrectiveTask(ListOfCorrectiveTasks(0))