Redundant Systems RBD: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
(Created page with '{{Reference Example|{{Banner BlockSim Reference Examples}}}} This example validates the results for redundant systems in BlockSim's analytical and simulation diagrams. {{Refer…')
 
No edit summary
 
Line 11: Line 11:
{{Reference_Example_Heading2}}
{{Reference_Example_Heading2}}


A small power plant is equipped with two identical generators in a cold standby system configuration. Hence, the standby generator starts working as soon as the active generator fails. The assumptions are that there are no interruptions between switches and that the switching system is 100% reliable. Each generator follows an exponential life distribution with a failure rate (lambda) of 3.6 × 10<sup>-5</sup> failures per hour. The reliability of the power plant at 5000 hours and the mean time to failure (MMTF) is calculated.
A small power plant is equipped with two identical generators in a cold standby system configuration. Hence, the standby generator starts working as soon as the active generator fails. The assumptions are that there are no interruptions between switches and that the switching system is 100% reliable. Each generator follows an exponential life distribution with a failure rate (lambda) of 3.6 × 10<sup>-5</sup> failures per hour. The reliability of the power plant at 5000 hours and the mean time to failure (MMTF) are calculated.




Line 23: Line 23:




By setting n = 2 in Equation 4.3 on page 81, the mean time to failure is calculated as 5.56 x 10<sup>4</sup> hours.
By setting n = 2 in Equation 4.30 on page 81, the mean time to failure is calculated as 5.56 x 10<sup>4</sup> hours.


<math>MTTF = \frac{n}{\lambda}=\frac{2}{3.6 \times 10^{-5}}= 5.56 \times 10^{4} \,\!</math>
<math>MTTF = \frac{n}{\lambda}=\frac{2}{3.6 \times 10^{-5}}= 5.56 \times 10^{4} \,\!</math>
Line 29: Line 29:


{{Reference_Example_Heading4|BlockSim}}
{{Reference_Example_Heading4|BlockSim}}
<!--
 
In BlockSim, the generator system RBD is configured as shown below.
In BlockSim, the generator system RBD is configured as shown below.


Line 65: Line 65:


[[Image:Redundant_simqcpmttf.png|center|500px]]
[[Image:Redundant_simqcpmttf.png|center|500px]]
-->

Latest revision as of 17:52, 20 August 2015

BlockSim Reference Examples Banner.png


New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.

As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at BlockSim examples and BlockSim reference examples.




Redundant Systems RBD

This example validates the results for redundant systems in BlockSim's analytical and simulation diagrams.


Reference Case

The data set is from example 4.7 on page 81 in the book Life Cycle Reliability Engineering by Dr. Guangbin Yang, John Wiley & Sons, 2007.


Data

A small power plant is equipped with two identical generators in a cold standby system configuration. Hence, the standby generator starts working as soon as the active generator fails. The assumptions are that there are no interruptions between switches and that the switching system is 100% reliable. Each generator follows an exponential life distribution with a failure rate (lambda) of 3.6 × 10-5 failures per hour. The reliability of the power plant at 5000 hours and the mean time to failure (MMTF) are calculated.


Result

Substituting the lambda and time into Equation 4.31 on page 81, the reliability of the system is calculated as 98.56% at time 5000 hours.

[math]\displaystyle{ R(t) = (1 + \lambda t)e^{-\lambda t} \,\! }[/math]
[math]\displaystyle{ R(5000) = (1 + (3.6 \times 10^{-5}) \times 5000)e^{-(3.6 \times 10^{-5}) \times 5000} = 0.9856\,\! }[/math]


By setting n = 2 in Equation 4.30 on page 81, the mean time to failure is calculated as 5.56 x 104 hours.

[math]\displaystyle{ MTTF = \frac{n}{\lambda}=\frac{2}{3.6 \times 10^{-5}}= 5.56 \times 10^{4} \,\! }[/math]


Results in BlockSim

In BlockSim, the generator system RBD is configured as shown below.

Redundant rbd.png


Each generator is modeled using an exponential distribution with a failure rate (lambda) of 3.6 x 10-5 failures per hour.


Analytical Proof

The reliability of the system at 5,000 hours is calculated in the QCP as 98.56%

Redundant qcp.png


The mean time to failure (MTTF) is calculated as 5.55 x 104 hours.

Redundant qcpmttf.png


Simulation Proof

We can also estimate the results by using the simulation tool in BlockSim. The simulation settings are shown below.

Redundant sim.png


The point reliability of the system at 5,000 hours is calculated in the QCP as 98.55%

Redundant simqcp.png


The mean time to failure (MTTF) is calculated as 5.84 x 104 hours.

Redundant simqcpmttf.png