Repository.Task.GetCorrectiveTask: Difference between revisions
Jump to navigation
Jump to search
Kate Racaza (talk | contribs) No edit summary |
Kate Racaza (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
<noinclude>{{Template:API}}{{Template:APIBreadcrumb|10|Repository}}</noinclude> | <noinclude>{{Template:API}}{{Template:APIBreadcrumb|10|Repository}}</noinclude> | ||
Gets the corrective task with the designated ID number and returns it as a [[CCorrectiveTask Class|cCorrectiveTask]] object. Returns nothing if the task does not exist or is not in the current project. | Gets the corrective task with the designated ID number and returns it as a '''[[CCorrectiveTask Class|cCorrectiveTask]]''' object. Returns nothing if the task does not exist or is not in the current project. | ||
<noinclude> | <noinclude> | ||
== Syntax == | == Syntax == |
Revision as of 18:04, 16 July 2015
Member of: SynthesisAPI10Repository
Gets the corrective task with the designated ID number and returns it as a cCorrectiveTask object. Returns nothing if the task does not exist or is not in the current project.
Syntax
object.Task.GetCorrectiveTask(ID)
where object is a variable that represents a Repository object.
Parameters
Name | Description | |
---|---|---|
IDborder="0" cellpadding="5" cellspacing="0" style="border-collapse: collapse; text-align: left; cellborder" | ||
Name | Status | Integer. The ID number of the corrective task to retrieve. |
Example
This example assumes that a corrective task with ID#1 exists in a repository.
VBA Dim MyRepository As New Repository ...'Add code to connect to a Synthesis repository. 'Get corrective task #1 from project #1. Dim MyTask As cCorrectiveTask MyRepository.Project.SetCurrentProject(1) Set MyTask = MyRepository.Task.GetCorrectiveTask(1) 'Output sample: Dim TaskName As String Dim TaskID As Integer TaskName = MyTask.Name TaskID = MyTask.ID MsgBox ("You got " & TaskName & ", ID#" & TaskID)
VB.NET
Dim MyRepository As New Repository ...'Add code to connect to a Synthesis repository. 'Get corrective task #1 from project #1. Dim MyTask As cCorrectiveTask MyRepository.Project.SetCurrentProject(1) MyTask = MyRepository.Task.GetCorrectiveTask(1) 'Output sample: Dim TaskName As String Dim TaskID As Integer TaskName = MyTask.Name TaskID = MyTask.ID MsgBox ("You got " & TaskName & ", ID#" & TaskID)