ALTADataSet.PlotUseStress: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
{{Template:ALTADataSet.PlotUseStress.Cmt}}
{{Template:ALTADataSet.PlotUseStress.Cmt}}


To set the use stress level for calculations, use the [[FittedModel.SetUseStress]] method.
To set the use stress level for calculations, use the [[CModel.SetUseStress|SetUseStress]] method on the ALTADataSet.FittedModel property.


== Syntax==
== Syntax==

Revision as of 23:38, 19 March 2014


Sets or gets the use stress value of a particular stress for use in plots (not calculations), using the specified stress index.

To set the use stress level for calculations, use the SetUseStress method on the ALTADataSet.FittedModel property.

Syntax

  • PlotUseStress( Index As Integer )

Parameters

Index: The index of the stress column (e.g., 0 = the first stress, 1 = the second, etc.).

Value

Type: double

Usage Example

This example demonstrates how to add a stress and set its stress transformation.

 'Declare the ALTADataSet. See ALTADataSet Constructors. 
 Dim ALTADS as New ALTADataSet
 
 'Add a new stress. 
 ALTADS.AddStressDefinition("Stress1")
 
 'Set the use stress level (to be used in plots) for the first stress. 
 ALTADS.PlotUseStress(0) = 200