::<math>\underset{i=1}{\overset{22}{\mathop \sum }}\,\ln {{T}_{i}}=105.6355\,\!</math> | ::<math>\underset{i=1}{\overset{22}{\mathop \sum }}\,\ln {{T}_{i}}=105.6355\,\!</math> | ||
Then: | |||
::<math>\widehat{\beta }=\frac{22}{22\ln 620-105.6355}=0.6142\,\!</math> | ::<math>\widehat{\beta }=\frac{22}{22\ln 620-105.6355}=0.6142\,\!</math> |
Revision as of 19:27, 24 January 2014
New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.
As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at RGA examples and RGA reference examples.
This example appears in the Reliability Growth and Repairable System Analysis Reference book.
A prototypes of a system was tested with design changes incorporated during the test. The following table presents the data collected over the entire test. Find the Crow-AMSAA parameters and the intensity function using maximum likelihood estimators.
Row | Time to Event (hr) | [math]\displaystyle{ ln{(T)}\,\! }[/math] |
---|---|---|
1 | 2.7 | 0.99325 |
2 | 10.3 | 2.33214 |
3 | 12.5 | 2.52573 |
4 | 30.6 | 3.42100 |
5 | 57.0 | 4.04305 |
6 | 61.3 | 4.11578 |
7 | 80.0 | 4.38203 |
8 | 109.5 | 4.69592 |
9 | 125.0 | 4.82831 |
10 | 128.6 | 4.85671 |
11 | 143.8 | 4.96842 |
12 | 167.9 | 5.12337 |
13 | 229.2 | 5.43459 |
14 | 296.7 | 5.69272 |
15 | 320.6 | 5.77019 |
16 | 328.2 | 5.79362 |
17 | 366.2 | 5.90318 |
18 | 396.7 | 5.98318 |
19 | 421.1 | 6.04287 |
20 | 438.2 | 6.08268 |
21 | 501.2 | 6.21701 |
22 | 620.0 | 6.42972 |
Solution
For the failure terminated test, [math]\displaystyle{ {\beta}\,\! }[/math] is:
- [math]\displaystyle{ \begin{align} \widehat{\beta }&=\frac{n}{n\ln {{T}^{*}}-\underset{i=1}{\overset{n}{\mathop{\sum }}}\,\ln {{T}_{i}}} \\ &=\frac{22}{22\ln 620-\underset{i=1}{\overset{22}{\mathop{\sum }}}\,\ln {{T}_{i}}} \\ \end{align}\,\! }[/math]
where:
- [math]\displaystyle{ \underset{i=1}{\overset{22}{\mathop \sum }}\,\ln {{T}_{i}}=105.6355\,\! }[/math]
Then:
- [math]\displaystyle{ \widehat{\beta }=\frac{22}{22\ln 620-105.6355}=0.6142\,\! }[/math]
And for [math]\displaystyle{ {\lambda}\,\! }[/math] :
- [math]\displaystyle{ \begin{align} \widehat{\lambda }&=\frac{n}{{{T}^{*\beta }}} \\ & =\frac{22}{{{620}^{0.6142}}}=0.4239 \\ \end{align}\,\! }[/math]
Therefore, [math]\displaystyle{ {{\lambda }_{i}}(T)\,\! }[/math] becomes:
- [math]\displaystyle{ \begin{align} {{\widehat{\lambda }}_{i}}(T)= & 0.4239\cdot 0.6142\cdot {{620}^{-0.3858}} \\ = & 0.0217906\frac{\text{failures}}{\text{hr}} \end{align}\,\! }[/math]
The next figure shows the plot of the failure rate. If no further changes are made, the estimated MTBF is [math]\displaystyle{ \tfrac{1}{0.0217906}\,\! }[/math] or 46 hours.