Failure Analysis.InitialRepairDate: Difference between revisions
Jump to navigation
Jump to search
John Leavitt (talk | contribs) No edit summary |
John Leavitt (talk | contribs) m (moved InitialRepairDate to Failure Analysis.InitialRepairDate) |
(No difference)
|
Revision as of 21:32, 23 October 2013
XML Element
<InitialRepairDate>
- <Year />
- <Month />
- <Day />
- <Hour />
- <Minute />
- <Second />
- <FormattedDate />
</IntialRepairDate>
Description
- The InitialRepairDate element is optional and if present must contain a valid date.