Repository.Task.UpdateCorrectiveTask: Difference between revisions
Jump to navigation
Jump to search
Albert Szeto (talk | contribs) No edit summary |
Albert Szeto (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
== Parameters == | == Parameters == | ||
'''task''' | '''task''' | ||
{{APIComment|The | {{APIComment|The corrective task to update in the repository.}} | ||
== Usage Example == | == Usage Example == |
Revision as of 17:04, 19 September 2013
Property Syntax
UpdateCorrectiveTask(
ByVal
task()
As
cCorrectiveTask
) As Boolean
Updates the Corrective task in the repository.
Parameters
task The corrective task to update in the repository.
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Get the list of corrective tasks in the connected repository from the current project.
Dim ListOfCorrectiveTasks() As cCorrectiveTask ListOfCorrectiveTasks = MyRepository.GetAllCorrectiveTasks()
After updating the task, update the repository
Dim SuccessUpdateCorrectiveTask As Boolean = False SuccessUpdateCorrectiveTask = MyRepository.UpdateCorrectiveTask(ListOfCorrectiveTasks(0))