''This example appears in the [[Crow-AMSAA_(NHPP)|Reliability Growth and Repairable System Analysis Reference book]]''.
''This example appears in the [https://help.reliasoft.com/reference/reliability_growth_and_repairable_system_analysis Reliability growth reference]''.
</noinclude>
</noinclude>


A one-shot system underwent reliability growth development for a total of 50 trials. The test was performed as a combination of configuration in groups and individual trial by trial. The table below shows the data set obtained from the test. The first column specifies the number of failures that occurred in each interval, and the second column shows the cumulative number of trials in that interval. Do the following:
A one-shot system underwent reliability growth development for a total of 50 trials. The test was performed as a combination of configuration in groups and individual trial by trial. The table below shows the data set obtained from the test. The first column specifies the number of failures that occurred in each interval, and the second column shows the cumulative number of trials in that interval. Do the following:


1) Estimate the parameters of the Crow-AMSAA model using maximum likelihood estimators.
#Estimate the parameters of the Crow-AMSAA model using maximum likelihood estimators.
2) What are the instantaneous reliability and the 2-sided 90% confidence bounds at the end of the test?
#What are the instantaneous reliability and the 2-sided 90% confidence bounds at the end of the test?
3) Plot the cumulative reliability with 2-sided 90% confidence bounds.
#Plot the cumulative reliability with 2-sided 90% confidence bounds.
4) If the test was continued for another 25 trials what would the expected number of additional failures be?
#If the test was continued for another 25 trials what would the expected number of additional failures be?


<center>'''Mixed Data'''</center>
<center>'''Mixed Data'''</center>
Line 39: Line 39:
   
   
'''Solution'''
'''Solution'''
<ol>
<li>The next figure shows the parameters estimated using RGA.


1) The next figure shows the parameters estimated using RGA.
[[Image:rga5.32.png|center|600px]]
</li>
<li>The figure below shows the calculation of the instantaneous reliability with the 2-sided 90% confidence bounds. From the QCP, it is estimated that the instantaneous reliability at stage 50 (or at the end of the test) is 72.70% with an upper and lower 2-sided 90% confidence bound of 82.36% and 39.59%, respectively.


[[Image:rga5.32.png|center|400px|Estimated parameters of the Crow-AMSAA model.]]
[[Image:rga5.33.png|center|450px]]
</li>
<li>The following plot shows the cumulative reliability with the 2-sided 90% confidence bounds.


2) The figure below shows the calculation of the instantaneous reliability with the 2-sided 90% confidence bounds. From the QCP, it is estimated that the instantaneous reliability at stage 50 (or at the end of the test) is 72.70% with an upper and lower 2-sided 90% confidence bound of 82.36% and 39.59%, respectively.
[[Image:rga5.34.png|center|450px]]
</li>
<li>The last figure shows the calculation of the expected number of failures after 75 trials. From the QCP, it is estimated that the cumulative number of failures after 75 trials is <math>26.3770\approx 27\,\!</math>. Since 20 failures occurred in the first 50 trials, the estimated number of additional failures is 7.


[[Image:rga5.33.png|center|400px|Instantaneous reliability with 2-sided 90% confidence bounds.]]
[[Image:rga5.35.png|center|450px]]
 
</li>
3) The following plot shows the cumulative reliability with the 2-sided 90% confidence bounds.
</ol>
 
[[Image:rga5.34.png|center|400px|Plot of cumulative reliability with 2-sided 90% confidence bounds.]]
 
4) The last figure shows the calculation of the expected number of failures after 75 trials. From the QCP, it is estimated that the cumulative number of failures after 75 trials is <math>26.3770\approx 27\,\!</math>. Since 20 failures occurred in the first 50 trials, the estimated number of additional failures is 7.
 
[[Image:rga5.35.png|center|400px|Cumulative number of failures after 75 trials.]]

Latest revision as of 21:21, 18 September 2023

RGA Examples Banner.png


New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.

As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at RGA examples and RGA reference examples.




This example appears in the Reliability growth reference.


A one-shot system underwent reliability growth development for a total of 50 trials. The test was performed as a combination of configuration in groups and individual trial by trial. The table below shows the data set obtained from the test. The first column specifies the number of failures that occurred in each interval, and the second column shows the cumulative number of trials in that interval. Do the following:

  1. Estimate the parameters of the Crow-AMSAA model using maximum likelihood estimators.
  2. What are the instantaneous reliability and the 2-sided 90% confidence bounds at the end of the test?
  3. Plot the cumulative reliability with 2-sided 90% confidence bounds.
  4. If the test was continued for another 25 trials what would the expected number of additional failures be?
Mixed Data
Failures in Interval Cumulative Trials Failures in Interval Cumulative Trials
3 4 1 25
0 5 1 28
4 9 0 32
1 12 2 37
0 13 0 39
1 15 1 40
2 19 1 44
1 20 0 46
1 22 1 49
0 24 0 50

Solution

  1. The next figure shows the parameters estimated using RGA.
    Rga5.32.png
  2. The figure below shows the calculation of the instantaneous reliability with the 2-sided 90% confidence bounds. From the QCP, it is estimated that the instantaneous reliability at stage 50 (or at the end of the test) is 72.70% with an upper and lower 2-sided 90% confidence bound of 82.36% and 39.59%, respectively.
    Rga5.33.png
  3. The following plot shows the cumulative reliability with the 2-sided 90% confidence bounds.
    Rga5.34.png
  4. The last figure shows the calculation of the expected number of failures after 75 trials. From the QCP, it is estimated that the cumulative number of failures after 75 trials is [math]\displaystyle{ 26.3770\approx 27\,\! }[/math]. Since 20 failures occurred in the first 50 trials, the estimated number of additional failures is 7.
    Rga5.35.png