Kate Racaza (talk | contribs) (Created page with '{{Reference Example|{{Banner BlockSim Reference Examples}}}} This example validates the results for series systems in BlockSim's analytical and simulation diagrams. {{Referenc…') |
Kate Racaza (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Reference Example|{{Banner BlockSim Reference Examples}}}} | {{Reference Example|{{Banner BlockSim Reference Examples}}}} | ||
This example validates the results for | This example validates the results for parallel systems in BlockSim's analytical and simulation diagrams. | ||
Line 6: | Line 7: | ||
The data set is from example 4.6 on page 73 in the book ''Life Cycle Reliability Engineering'' by Dr. Guangbin Yang, John Wiley & Sons, 2007. | The data set is from example 4.6 on page 73 in the book ''Life Cycle Reliability Engineering'' by Dr. Guangbin Yang, John Wiley & Sons, 2007. | ||
{{Reference_Example_Heading2}} | {{Reference_Example_Heading2}} | ||
A lighting system uses three identical bulbs. The lifetimes of the bulbs are assumed to follow | A lighting system uses three identical bulbs. The lifetimes of the bulbs are assumed to follow a 2-paremeter Weibull with parameters α = 35,800 hours (this is the eta value in BlockSim) and β = 1.35. We calculate the reliability of the system after 8760 hours of use, and the number of bulbs needed to be connected in parallel to achieve 99.99% reliability at that time. | ||
{{Reference_Example_Heading3}} | {{Reference_Example_Heading3}} | ||
Line 33: | Line 36: | ||
Therefore, | Therefore, a minimum of 5 bulbs in parallel configuration are needed to achieve 99.99% reliability. | ||
{{Reference_Example_Heading4|BlockSim}} | {{Reference_Example_Heading4|BlockSim}} | ||
In BlockSim, the lighting system RBD is configured as shown below. | In BlockSim, the lighting system RBD is configured as shown below. | ||
Line 44: | Line 47: | ||
[[Image:parallel_rbd.png|center]] | [[Image:parallel_rbd.png|center]] | ||
Each bulb is modeled with | Each bulb is modeled with a 2-parameter Weibull distribution with parameters eta = 35,800 hours and beta = 1.35. | ||
'''Analytical Proof''' | '''Analytical Proof''' | ||
The reliability after 8760 hours of use is estimated to be 99.73%, which is the same result as calculated in the reference book. | |||
[[Image:parallel_qcp.png|center|500 px]] | |||
The minimum number of bulbs required to achieve 99.99% reliability after 8760 hours of use can be estimated via the Allocation Analysis tool. | |||
[[Image:parallel_allocation.png|center]] | |||
The analysis shows that the number of bulbs needs to be increased to 1.55506. Therefore, the total number of bulbs needed in parallel to achieve 99.99% reliability after 8760 hours of use is 4.66518 bulbs, which is the sum of the "Equivalent Parallel Units" column shown below. This number is almost exactly the same as the one calculated in the reference book. | |||
[[Image:parallel_allocationresult.png|center]] | |||
'''Simulation Proof''' | |||
We can also estimate the results by using the simulation tool in BlockSim. The simulation settings are shown below. | |||
[[Image:parallel_sim.png|center|500 px]] | |||
The point reliability after 8760 hours of use is estimated to be 99.77%. | |||
[[Image:parallel_simqcp.png|center|500 px]] |
Latest revision as of 17:12, 31 July 2015
New format available! This reference is now available in a new format that offers faster page load, improved display for calculations and images and more targeted search.
As of January 2024, this Reliawiki page will not continue to be updated. Please update all links and bookmarks to the latest references at BlockSim examples and BlockSim reference examples.