Template:WebNotes/RBI Plot: Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
|- | |- | ||
| [[Image:Helpblue.png]] | | [[Image:Helpblue.png]] | ||
| [http://help.synthesisplatform.net/xfmea_rcm_rbi10/rbi_plots.htm | | V9 Help or [http://help.synthesisplatform.net/xfmea_rcm_rbi10/index.htm#rbi_plots.htm V10 Help] | ||
|} | |} |
Revision as of 20:23, 30 April 2015
RBI Plots
The RBI Plot shows the risks associated with the component versus the various critical dates during analysis. Either the area risk or the financial risk can be viewed at a given time, based on the plot type selected. If a component does not have a calculated area risk (HEXTUBE or Atmospheric Tank), then only the Financial Risk Plot will show results. PRDs do not have the RBI plot feature. The risk values that always appear for a component are those associated with the RBI date and the Plan Date w/o inspections. If the component is calculated to require inspections prior to the Plan Date, then the risks at the Target date (for inspections) and the Plan Date (with Inspections performed) are also shown. Lastly, if by estimation the component reaches minimum wall thickness, a red line will be shown to signify the date associated with reaching minimum wall thickness. |
Learn more from...
V9 Help or V10 Help |