Template:WebNotes/MPCZonalEnhanced: Difference between revisions
Jump to navigation
Jump to search
Lisa Hacker (talk | contribs) No edit summary |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 8: | Line 8: | ||
*The potential effects of fire caused by a wiring/EWIS failure on adjacent wiring and systems. | *The potential effects of fire caused by a wiring/EWIS failure on adjacent wiring and systems. | ||
It then prompts the analyst to consider whether a zonal general visual inspection | It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs). | ||
Finally, | Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection intervals. The team can then use the Tasks area to record the recommended tasks. | ||
|} | |} | ||
Line 18: | Line 18: | ||
|- | |- | ||
| [[Image:Helpblue.png]] | | [[Image:Helpblue.png]] | ||
| [http://help. | | [http://help.synthesisplatform.net/mpc9/index.htm#enhanced_zonal_analysis.htm V9 Help] or[http://help.synthesisplatform.net/mpc10/index.htm#enhanced_zonal_analysis.htm V10 Help] | ||
|- | |- | ||
Latest revision as of 15:50, 30 April 2015
Enhanced Zonal Analysis
The Zonal (Enhanced) rating system considers:
It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs). Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection intervals. The team can then use the Tasks area to record the recommended tasks. |
Learn more from...
V9 Help orV10 Help |