Repository.Task.AddCorrectiveTask: Difference between revisions
Jump to navigation
Jump to search
Chris Kahn (talk | contribs) No edit summary |
Chris Kahn (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
{{Template:Repository.AddCorrectiveTask.Cmt}} {{Template:BooleanReturn.Cmt}} | {{Template:Repository.AddCorrectiveTask.Cmt}} {{Template:BooleanReturn.Cmt}} | ||
==Syntax== | ==Syntax== | ||
*AddCorrectiveTask( task {{APIPrefix|As}} [[cCorrectiveTask Class|cCorrectiveTask]]{{APIPrefix| | *AddCorrectiveTask( task {{APIPrefix|As}} [[cCorrectiveTask Class|cCorrectiveTask]] ){{APIPrefix| As Boolean}} | ||
Parameters | Parameters |
Revision as of 18:06, 27 February 2014
Saves the corrective task in the repository. Returns True if successful, otherwise returns False.
Syntax
- AddCorrectiveTask( task As cCorrectiveTask ) As Boolean
Parameters
- task: The cCorrectiveTask to add.
Usage Example
Declare a new repository connection class.
Private WithEvents MyRepository As New Repository
Connect to the Synthesis repository.
Dim Success As Boolean = False Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")
Declare a new cCorrectiveTask.
Dim newCorrectiveTask As New cCorrectiveTask("NewCorrectiveTask1")
After creating the task, update the repository
Dim SuccessAddCorrectiveTask As Boolean = False SuccessAddCorrectiveTask = MyRepository.AddCorrectiveTask(newCorrectiveTask)