ALTADataSet.PlotUseStress: Difference between revisions
Jump to navigation
Jump to search
John Leavitt (talk | contribs) No edit summary |
Chris Kahn (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
{{Template:ALTADataSet.PlotUseStress.Cmt}} | {{Template:ALTADataSet.PlotUseStress.Cmt}} | ||
== | == Syntax== | ||
{{ | <ul><li> | ||
PlotUseStress( | |||
Index | |||
{{APIPrefix|As Integer}} | |||
) | |||
{{APIPrefix|As Double}} | |||
</li></ul> | |||
Parameters | |||
:''Index'': The index of the stress column (e.g., 0 = the first stress, 1 = the second, etc.). | |||
== Usage Example == | == Usage Example == |
Revision as of 22:54, 25 February 2014
Sets or gets the use stress value of a particular stress for use in plots (not calculations), using the specified stress index.
Syntax
- PlotUseStress( Index As Integer ) As Double
Parameters
- Index: The index of the stress column (e.g., 0 = the first stress, 1 = the second, etc.).
Usage Example
Declare the ALTADataSet. See New ALTADataSet for additional details.
Dim ALTADS as New ALTADataSet
Declare an ALTAStressProfile. See ALTAStressProfile for additional details.
Dim sp = New ALTAStressProfile("Profile1") sp.RepeatCycle = True sp.AddSegment(1, 250) sp.AddSegment(2, 300) sp.AddSegment(3, 400)
Add the stress profile. See ALTADataSet.AddStressProfile for additional details
ALTADS.AddStressProfile(sp)
Set the Use Stress level for the stress profile.
ALTADS.PlotUseStress(0) = 200