Repository.UpdateScheduledTask: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
(Created page with '{{Template:APIClass|Repository Class|Repository}} == Method Syntax == {{APIName|UpdateScheduledTask(}} {{APIPrefix|ByVal}} {{APIName|task()}} {{APIPrefix|As}} {{APIName|[[cSche…')
 
No edit summary
Line 1: Line 1:
{{Template:APIClass|Repository Class|Repository}}
{{Template:APIClass|Repository Class|Repository}}
 
Updates the scheduled task
== Method Syntax  ==
== Method Syntax  ==
{{APIName|UpdateScheduledTask(}}
{{APIName|'''UpdateScheduledTask'''(}}
{{APIPrefix|ByVal}}
{{APIPrefix|ByVal}}
{{APIName|task()}}
{{APIName|task()}}

Revision as of 23:42, 23 September 2013


Updates the scheduled task

Method Syntax

UpdateScheduledTask( ByVal task() As cScheduledTask ) As Boolean
Updates the scheduled task in the repository.

Parameters

task The scheduled task to update in the repository.

Usage Example

Declare a new repository connection class.

       Private WithEvents MyRepository As New Repository

Connect to the Synthesis repository.

       Dim Success As Boolean = False
       Success = MyRepository.ConnectToRepository("RepositoryFileNamePath")

Get the list of scheduled tasks in the connected repository from the current project.

       Dim ListOfScheduledTasks() As cScheduledTask
       ListOfScheduledTasks = MyRepository.GetAllScheduledTasks()

After updating the task, update the repository

       Dim SuccessUpdateScheduledTask As Boolean = False
       SuccessUpdateScheduledTask = MyRepository.UpdateScheduledTask(ListOfScheduledTasks(0))