Template:CCrew.IncludeCrewDelayInCost: Difference between revisions
Jump to navigation
Jump to search
John Leavitt (talk | contribs) No edit summary |
Albert Szeto (talk | contribs) No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
{{APIPrefix|Public | {{APIPrefix|Public Property}} | ||
{{APIName|[[cCrew.IncludeCrewDelayInCost|IncludeCrewDelayInCost]]}} | {{APIName|[[cCrew.IncludeCrewDelayInCost|IncludeCrewDelayInCost]]}} | ||
{{APIPrefix|As Boolean}}<br> | {{APIPrefix|As Boolean}}<br> | ||
{{APIComment|Sets or returns whether logistic delay should be included in the cost the resource belongs to.}} | {{APIComment|Sets or returns whether logistic delay should be included in the cost the resource belongs to.}} |
Latest revision as of 18:13, 19 September 2013
Public Property
IncludeCrewDelayInCost
As Boolean
Sets or returns whether logistic delay should be included in the cost the resource belongs to.