Template:WebNotes/MPCZonalEnhanced: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:
It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs).
It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs).


Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection interval.
Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection intervals. The team can then use the Tasks area to record the recommended tasks.


|}  
|}  

Revision as of 18:19, 29 May 2013

Webnotesbanner-MPC.png
Enhanced Zonal Analysis

The Zonal (Enhanced) rating system considers:

  • The size of the zone and the density of the equipment in the zone.
  • The potential effects of fire caused by a wiring/EWIS failure on adjacent wiring and systems.

It then prompts the analyst to consider whether a zonal GVI (general visual inspection) alone will be effective for the entire zone, or if it should be augmented with a standalone GVIs and/or detailed inspections (DETs).

Finally, ratings for the likelihood of accidental damage and environmental deterioration can be used to determine the appropriate inspection intervals. The team can then use the Tasks area to record the recommended tasks.

Learn more from...

Helpblue.png the help file...











Docedit.png