Repository.Task.GetAllScheduledTasks

From ReliaWiki
Revision as of 18:25, 10 September 2015 by Kate Racaza (talk | contribs)
Jump to navigation Jump to search
APIWiki.png


Member of: SynthesisAPI10.Repository


Gets a list of scheduled tasks associated with a project (does not include global or reference tasks). Returns a cScheduledTask object array that contains all the scheduled tasks in that project.

Syntax

.Task.GetAllScheduledTasks()


Example

This example assumes that scheduled tasks exist in the first available project of a repository.

VBA|VB.NET

 'Add code to connect to a Synthesis repository. 
 Dim MyRepository As New Repository
  ... 

 'Get a list of all scheduled tasks in project #1. 
 Dim ListofTasks() As cScheduledTask
 MyRepository.Project.SetCurrentProject (1)  
 ListofTasks = MyRepository.Task.GetAllScheduledTasks()

 'Output sample: Display the number of elements in the array. 
 Dim NumberofElements As Integer
 NumberofElements = UBound(ListofTasks) - LBound(ListofTasks) + 1
 MsgBox (NumberofElements)