BlockSim Example: Phase with Phase Subdiagram Block
Jump to navigation
Jump to search
Phase with subdiagram phase block
Consider a server has two shifts each day, the day shift lasts 8 hours and the night shift lasts 16 hours. In each shift it has peak period and off-peak period with different duration.
Purposes
The purposes of this example is to illustrate how to use subdiagram phase block in phase simulation. The subdiagram phase block can help to reduce the repetition and complexity in modeling.
RBDs for Phase and settings
The RBDs for Peak phase and Off Peak phase are as followings: