BlockSim Simulation RBD Plot ptCost: Difference between revisions

From ReliaWiki
Jump to navigation Jump to search
Chuck Smith (talk | contribs)
No edit summary
Chuck Smith (talk | contribs)
No edit summary
Line 9: Line 9:
|-
|-
| valign="middle" |
| valign="middle" |
{{bs system cost}}
Cost shows the system’s cost over time. If there are costs associated with crews and with spare part pools, these are also displayed.
|}
|}
<br>  
<br>  

Revision as of 21:38, 8 March 2012

Diagram Simulation Plot Cost

Cost shows the system’s cost over time. If there are costs associated with crews and with spare part pools, these are also displayed.


Learn more from...

the help files...
the theory textbook...
use example(s)...