|
|
(One intermediate revision by one other user not shown) |
Line 1: |
Line 1: |
| ==Generalized Eyring Relationship==
| | #REDIRECT [[Eyring_Relationship#Generalized_Eyring_Relationship]] |
| | |
| ===Introduction===
| |
| | |
| <br>
| |
| The generalized Eyring relationship is used when temperature and a second non-thermal stress (e.g. voltage) are the accelerated stresses of a test and their interaction is also of interest. This relationship is given by:
| |
| | |
| <br>
| |
| ::<math>L(V,U)=\frac{1}{V}{{e}^{A+\tfrac{B}{V}+CU+D\tfrac{U}{V}}}</math>
| |
| | |
| <br>
| |
| :where:
| |
| | |
| <br>
| |
| • is the temperature (in absolute units ).
| |
| | |
| • <math>U</math> is the non-thermal stress (i.e. voltage, vibration, etc.).
| |
| <math>A,B,C,D</math> are the parameters to be determined.
| |
|
| |
| | |
| <br>
| |
| The Eyring relationship is a simple case of the generalized Eyring relationship where <math>C=D=0</math> and <math>{{A}_{Eyr}}=-{{A}_{GEyr}}.</math>
| |
| Note that the generalized Eyring relationship includes the interaction term of <math>U</math> and <math>V</math> as described by the <math>D\tfrac{U}{V}</math> term. In other words, this model can estimate the effect of changing one of the factors depending on the level of the other factor.
| |
| | |
| {{gen-eyring acceleration factor}}
| |
| | |
| {{generalized eyring-exponential}}
| |
| | |
| {{generalized eyring-weibull}}
| |
| | |
| {{generalized eyring-log}}
| |
| | |
| ===Example===
| |
| <br>
| |
| The following data set represents failure times (in hours) obtained from an electronics epoxy packaging accelerated life test performed to understand the synergy between temperature and humidity and estimate the <math>B10</math> life at the use conditions of <math>T=350K</math> and <math>H=0.3</math> . The data set is modeled using the lognormal distribution and the generalized Eyring model.
| |
| <br>
| |
| | |
| [[Image:altaproject.png|thumb|center|400px| ]] | |
| | |
| [[Image:altaaccelerated.png|thumb|center|400px| ]]
| |
| | |
| [[Image:altatimes2fail.png|thumb|center|400px|]]
| |
| | |
| [[Image:tempNhumin.png|thumb|center|400px|]]
| |
| | |
| [[Image:406-1-2.png|thumb|center|400px|]]
| |
| <math></math>
| |
| | |
| The probability plot at the use conditions is shown next.
| |
| | |
| <br>
| |
| [[Image:plotfolio426.png|thumb|center|400px|]]
| |
| <br>
| |
|
| |
| The <math>B10</math> information is estimated to be 3004.63 hours, as shown next.
| |
| <br>
| |
| [[Image:tempBX.png|thumb|center|400px|]]
| |
| | |
| <br>
| |